Sangubashi No. 3 Railroad Crossing (Takaki)

5 Centimeters Per Second

秒速5センチメートル

MovieJapan280

BangumiAnitabiExport KML
Original work
Shinkai Makoto
Director
Shinkai Makoto
Studio
CoMix Wave
Original character design
Shinkai Makoto
Character design
Nishimura Takayo
Music
Tenmon
Characters
  • Toono TakakiCV Mizuhashi Kenji, JIANG,JHIN-LUN
  • Shinohara AkariCV kondou yoshimi, 尾上綾華
  • 澄田花苗CV Hanamura Satomi, 張茜雯
  • Mizuno RisaCV Mizuno Risa
  1. Construction Site Beside Takaki's Home2026-10-23
  2. Shinjuku Distant View 12026-10-23
  3. Episode 3 Snapshot2026-10-23
  4. Anime Tourism
    Takaki and Kanae's High School2026-10-23
  5. Episode 3 Snapshot2026-10-23
  6. Anime Tourism
    Adult Akari Waiting at Railroad Crossing2026-10-23
  7. Anime Tourism
    Oyama Station2026-10-23
  8. Inside Iwafune Station2026-10-23
  9. Anime Tourism
    Final Railroad Crossing2026-10-23
  10. Stairs Beside the House2026-10-23
  11. Anime Tourism
    Kanda Station2026-10-23
  12. Melting Asphalt2026-10-23
  13. Ogurayama-so Fushimi Omotemachi Branch2026-10-23
  14. Anime Tourism
    Omiya Station2026-10-23
  15. Anime Tourism
    Nogi Station2026-10-23
  16. Anime Tourism
    Musashi-Urawa Station2026-10-23
  17. Anitabi
    JR Oyama Station Platform 6 Standing Soba Shop16:24
  18. Anitabi
    JR Iwafune Station Platforms 2 and 3 Takasaki-side End19:12
  19. Anitabi
    JR Iwafune Station Platform 2 Oyama-side End25:05
  20. Anitabi
    JR Omiya Station Platform 9 Electronic Display11:15
  21. Anitabi
    JR Omiya Station Platforms 3 and 4 Bench10:58
  22. Anitabi
    In Front of JR Omiya Station Central Ticket Gate11:00
  23. Anitabi
    JR Omiya Station Platform 9 Guide Board11:14
  24. Anitabi
    JR Oyama Station Platforms 6 and 8 (2)16:13
  25. Anitabi
    JR Oyama Station Platform 6 (3)16:34
  26. Anitabi
    JR Oyama Station Platforms 6 and 8 (1)15:51
  27. Anitabi
    JR Iwafune Station Platforms 2 and 3 Station Name Sign19:11
  28. Anitabi
    JR Oyama Station Platforms 6 and 8 (4)17:00
  29. Anitabi
    Timetable and Clock, JR Oyama Station Platforms 6 and 815:48
  30. Anitabi
    JR Iwafune Station Overpass19:28
  31. Anitabi
    JR Iwafune Station Platform 2 Bench
  32. Anitabi
    JR Iwafune Station Platforms 2 and 3 Near Oyama-side End24:38
  33. Anitabi
    JR Iwafune Station Bicycle Parking21:43
  34. Anitabi
    JR Iwafune Station Platform 3 Catenary Pole51:09
  35. Anitabi
    JR Iwafune Station Platforms 2 and 3 Takasaki-side EndEP 551:142024-08-18
  36. Anitabi
    JR Iwafune Station Platforms 2 and 3 Near the CenterEP 551:212024-08-18
  37. Anitabi
    JR Iwafune Station Platform 2 Oyama-side EndEP 557:002024-08-19
  38. Anitabi
    Stone Pavement7:062024-07-02
  39. Anitabi
    JR Omiya Station Platform 19, Shinjuku-Side End10:49
  40. Anitabi
    LUMINE Omiya Store10:54
  41. Anitabi
    Apartment Building near Oyama16:05
  42. Anitabi
    JR Iwafune Station Platforms 2 and 3 Near the Center19:28
  43. Anitabi
    Stairs to JR Oyama Station Platform 615:43
  44. Anitabi
    JR Iwafune Station Waiting Room19:48
  45. Anitabi
    In Front of JR Iwafune Station21:57
  46. Anitabi
    JR Tsugaru Line Mitsuishi Station Waiting Room19:48
  47. Anitabi
    Sangubashi No. 3 Railroad Crossing (Takaki)49:182024-07-02
  48. Anitabi
    JR Oyama Station Track 10 Platform, Omiya-side End
  49. Anitabi
    JR Iwafune Station Platforms 2 and 3 Near the CenterEP 119:282024-08-12
  50. Anitabi
    JR Oyama Station Platform 13 (1)55:082024-08-18
  51. Anitabi
    JR Kuki Station Platform 212:10
  52. Anitabi
    JR Omiya Station Shinkansen Platform11:04
  53. Anitabi
    Beside the Stationmaster's Office, JR Oyama Station Platform 912:14
  54. Anitabi
    JR Kuki Station Platform 1 (2)12:22
  55. Anitabi
    North Overpass, JR Oyama Station15:27
  56. Anitabi
    Lattice Tower Within JR Oyama Station16:08
  57. Anitabi
    Street Light21:46
  58. Anitabi
    JR Iwafune Station Platform 2 BenchEP 124:462024-08-12
  59. Anitabi
    Sangubashi No. 1 Railroad Crossing (Takaki Beyond)0:412024-07-02
  60. Anitabi
    JR Oyama Station Waiting Plaza15:32
5 Centimeters Per Second47 / 280
Anitabi

Sangubashi No. 3 Railroad Crossing (Takaki)

参宮橋3号踏切(貴樹)
49:182024-07-02

★Confirmed on site March 30, 2010. Episode 3's level crossing. In the scene where Takaki walks toward it from the distance, the alarm that starts ringing as Takaki tries to cross the tracks. The overhead line pole visible behind is also the same as in the film, but the building in the background is omitted from the film shots. 49:18:88 Shot of Takaki walking from across the crossing. 59:17:31 Shot of Akari standing behind the crossing gate, seen from behind. 59:19:76 Shot of the train separating the two. Because the road crosses the tracks diagonally, in reality the composition cannot show a train passing straight across as in the film. 59:44:83 Background of the final scene of Episode 3, where Takaki turns around and starts walking. The actual overhead line pole shape is also exactly the same as in the film. 59:49:42 Final shot of Episode 3. Cherry petals keep drifting over the crossing after the two have left. Depending on the season, a construction notice board like the one in the film may be installed beside the crossing. The tree of the house on the left across the crossing has had its branches trimmed. Also, there are no cherry trees at all around this crossing, lol

Source:AnitabiReport an issue
AnitabiCC BY-NC-SA 4.0Bangumi© OpenStreetMap© OpenMapTilesOpenFreeMapTerrain Tiles
Source code

Keyboard shortcuts

/Ctrl K
Search
Esc
Back
Ctrl Z
Undo
Ctrl YCtrl ⇧ Z
Redo
JK↓↑
Previous / next spot
O
Open in Maps
+−
Zoom in / Zoom out
L
My location
N
Reset north
T
Switch appearance
?
Keyboard shortcuts